2024/03/04 |
|
PCN (Product Change Notice)
|
With regards to the above reference, Littelfuse would like to inform you that we would relocate the manufacturing factory for holders and fuses which are currently made in Piedras Negras, Mexico to a new location in Piedras Negras,
The address for the current location is: Libramento Venustiano Carranza 2501 Col. Lomas de la Villa 26090 PIEDRAS NEGRAS Coahuila MEXICO
The address for the new location will be: Parque Industrial Piedras Negras Avenida Industrial y Libramiento Manuel Pere Treviño Interior #19 Piedras Negras, Coahuila, México Zip Code 26070 |
2024/04/08 |
|
PCN (Product Change Notice)
|
Although it is located in the same city of Piedras Negras, Mexico, where the current factory is located, It will be relocated to another location approximately 5 kilometers away. There are no changes to equipment, manufacturing processes, personnel, or product characteristics. |
2024/04/08 |
|
PCN (Product Change Notice)
|
Supplier Notice No.:EPCN-343129 Title: Manufacturing location change for holders and fuses made in Piedras Negras
Description: Littelfuse would like to inform you that we would relocate the manufacturing factory for holders and fuses which are currently made in Piedras Negras, Mexico to a new location in Piedras Negras, Coahuila Mexico.
The relocation will not impact form, fit or function of the products; neither product nor process will be changed, our operators and equipment will be the same and suppliers will be maintained.
The production line transfer will take place from Mar.4th, 2024, and the production will be resumed by Apr.8th, 2024. |
2024/06/06 |
|
PCN (Product Change Notice)
|
Supplier will comfirm devices affected and provide a list of devices actually~converting |
2024/06/13 |
|
PCN (Product Change Notice)
|
Supplier Notice No.:PCN47-IDM-24 Title: Carling Passivation and Plating Supplier Transition
Description of the Change: We will be transitioning away from the supplier who performed metal component passivation and plating processes on the attached finished goods.
Reason for The Change: The current supplier of these services has informed us that it is no longer in their strategy to provide such services on the components we require.
Effective Date of the Change: This will be conducted as a running change, effective immediately. |
2024/06/21 |
|
PCN (Product Change Notice)
|
Supplier will comfirm devices affected and provide a list of devices actually~converting |