2020/11/30 |
|
PCN(Product Change Notice)
|
Product / Process Change Notification H9A Capacity Increase for all Consumer MEMS products. |
2021/01/08 |
|
PCN(Product Change Notice)
|
MBB (Material Barrier Bag) : extend print out warning message on shelf life Type of Change: Any indirect material modifications for shipping products in dimensions, material, composition, orientation… (OLD) Due to historical reasons, the MBB ST is providing for SMD (Surface Mount Device) products have printed advise message alerting on 12 months of shelf life in sealed bags. (NEW) To align with extended shelf life International trends, the print out advise message for SMD products and in any case all products packed with MBB will be changed alerting on 24 months of shelf life in sealed bags.
|
2021/03/01 |
|
PCN(Product Change Notice)
|
H9A Capacity Increase for all Consumer MEMS products. |
2021/05/03 |
|
PCN(Product Change Notice)
|
MEMS Change on selected Product Families (see detailed list). |
2021/05/03 |
|
PCN(Product Change Notice)
|
CHANGE NOTIFICATION DESCRIPTION Die redesign : Mask or mask set change with new die design like metallization (specifically chip frontside) or bug fix.
Manufacturing Location: ST Malta, ST Calamba
Description of change: OLD: SK33 sensor line (old generation) NEW: SK40 sensor line (new generation) |
2022/04/24 |
|
PCN(Product Change Notice)
|
Setup of a 2nd EMEA DC in Frankfurt for closer deliveries to customers in Germany & Eastern Europe. The change also includes personnel, location, logistic model.. |
2022/05/08 |
|
PCN(Product Change Notice)
|
Notification related to 2nd EMEA DC project in Frankfurt Timing / schedule Intended start of delivery 2022-05-08 |
2022/05/08 |
|
PCN(Product Change Notice)
|
Notification related to 2nd EMEA DC project in Frankfurt
Timing / schedule Intended start of delivery 2022-05-08 |
2022/05/15 |
|
PCN(Product Change Notice)
|
Notification related for 2nd EMEA DC project in Frankfurt |
2023/05/31 |
|
PCN(Product Change Notice)
|
NEW 12” WAFERS FAB (AG300) IN AGRATE AVAILABLE FOR PRODUCTION (EARLY NOTIFICATION) Timing / schedule Intended start of delivery : 2023-05-31 |
2024/01/27 |
|
PCN(Product Change Notice)
|
MBB (Material Barrier Bag) : extend print out warning message on shelf life |
2024/08/28 |
|
PCN(Product Change Notice)
|
Description of change Old: ASIC diffused in ST FRANCE. New: ASIC diffused in ST FRANCE and ST ITALY.
Timing / schedule Intended start of delivery 2025-03-30 |