Chip One Stop – 电子元器件、半导体的销售网站
Menu
Taiwan
Change
中文
SELECT YOUR LANGUAGE
美元
SELECT YOUR CURRENCY FOR DISPLAY
关于优惠等级和折扣率

目前的商品价格将适用于以下


・根据顾客的购买情况可以享受优惠和折扣
・关于折扣仅限于从本网站直接下单的订单
・部分产品和阶梯数量不被包含在优惠折扣产品中
・关于优惠等级的详细信息请联系您的销售人员
・不能与其它优惠同时使用

PCN/PDN/NRND信息

PCN(产品/工艺变更通知)和PDN(生产中断通知)信息。

通知日期 通知文书 通知类型 通知信息
2020/03/10 PCN(产品规格变更通知) JSCC capacity increase - for listed products
[Old]
Silver wire bonding

[New]
Silver wire bonding
Gold wire bonding
2020/06/12 PCN(产品规格变更通知) For StatsChipPAC JSCC Jiangyin China capacity increase
Silver wire bonding > Silver wire bonding + Gold wire bonding
2021/01/08 PCN(产品规格变更通知) PRODUCT / PROCESS CHANGE INFORMATION
MBB (Material Barrier Bag) : extend print out warning message on shelf life
Type of change: Any indirect material modifications for shipping products in dimensions, material, composition, orientation…
(OLD) Due to historical reasons, the MBB ST is providing for SMD (Surface Mount Device) products have printed advise message alerting on 12 months of shelf life in sealed bags.
(NEW) To align with extended shelf life International trends, the print out advise message for SMD products and in any case all products packed with MBB will be changed alerting on 24 months of shelf life in sealed bags.
2021/10/07 PCN(产品规格变更通知) GLWO Labeling and Printing Rollout Project (Category 1 label design enhancement)
Description of change
Old Due to the technical limitation of the printing solution,
customized Labels containing a 2D barcode using the QR code format
is printing an extra text line which is displaying the QR code contents.
This is extra text line is not requested and is not used by the customer.
New The customized labels will be printed using the new labelling printing application.
The customized labels pasted on the inner boxes or outer boxes that
are using the QR codes format will no longer contain an extra text line.
The sequence of information and fields remain the same with respect to customer specifications.
2022/04/24 PCN(产品规格变更通知) Setup of a 2nd EMEA DC in Frankfurt for closer deliveries to customers in
Germany & Eastern Europe. The change also includes personnel, location,
logistic model..
2022/05/08 PCN(产品规格变更通知) NEW DISTRIBUTION CENTER
Notification related to 2nd EMEA DC project in Frankfurt
Timing / schedule
Intended start of delivery 2022-05-08
2022/05/15 PCN(产品规格变更通知) Notification related for 2nd EMEA DC project in Frankfurt
2022/11/23 PCN(产品规格变更通知) ST MUAR Enhanced traceability with 2D marking for LQFP7x7, LQFP10x10 & LQFP14x14
Timing / schedule Intended start of delivery 2022-11-23
2023/04/01 PCN(产品规格变更通知) ST MUAR - Capacity increase for LQFP 48 7x7 products listed.
请点击这里进行最后的购买咨询
PCN/PDN/NRND信息
通知类型
通知信息
通知日期
通知产品
制造商 制造商零件编号 最后购买时间 后继产品

通知产品的产品信息

   12345  最后  下1页
相关结果:5,219 件中 / 1~25现在显示






   12345  最后  下1页
相关结果:5,219 件中 / 1~25现在显示