2020/03/10 |
|
PCN(製品仕様変更通知書)
|
JSCC capacity increase - for listed products [Old] Silver wire bonding
[New] Silver wire bonding Gold wire bonding |
2020/06/12 |
|
PCN(製品仕様変更通知書)
|
For StatsChipPAC JSCC Jiangyin China capacity increase Silver wire bonding > Silver wire bonding + Gold wire bonding |
2021/01/08 |
|
PCN(製品仕様変更通知書)
|
PRODUCT / PROCESS CHANGE INFORMATION MBB (Material Barrier Bag) : extend print out warning message on shelf life Type of change: Any indirect material modifications for shipping products in dimensions, material, composition, orientation… (OLD) Due to historical reasons, the MBB ST is providing for SMD (Surface Mount Device) products have printed advise message alerting on 12 months of shelf life in sealed bags. (NEW) To align with extended shelf life International trends, the print out advise message for SMD products and in any case all products packed with MBB will be changed alerting on 24 months of shelf life in sealed bags. |
2021/10/07 |
|
PCN(製品仕様変更通知書)
|
GLWO Labeling and Printing Rollout Project (Category 1 label design enhancement) Description of change Old Due to the technical limitation of the printing solution, customized Labels containing a 2D barcode using the QR code format is printing an extra text line which is displaying the QR code contents. This is extra text line is not requested and is not used by the customer. New The customized labels will be printed using the new labelling printing application. The customized labels pasted on the inner boxes or outer boxes that are using the QR codes format will no longer contain an extra text line. The sequence of information and fields remain the same with respect to customer specifications. |
2022/04/24 |
|
PCN(製品仕様変更通知書)
|
Setup of a 2nd EMEA DC in Frankfurt for closer deliveries to customers in Germany & Eastern Europe. The change also includes personnel, location, logistic model.. |
2022/05/08 |
|
PCN(製品仕様変更通知書)
|
NEW DISTRIBUTION CENTER Notification related to 2nd EMEA DC project in Frankfurt Timing / schedule Intended start of delivery 2022-05-08 |
2022/05/15 |
|
PCN(製品仕様変更通知書)
|
Notification related for 2nd EMEA DC project in Frankfurt |
2022/11/23 |
|
PCN(製品仕様変更通知書)
|
ST MUAR Enhanced traceability with 2D marking for LQFP7x7, LQFP10x10 & LQFP14x14 Timing / schedule Intended start of delivery 2022-11-23 |
2023/04/01 |
|
PCN(製品仕様変更通知書)
|
ST MUAR - Capacity increase for LQFP 48 7x7 products listed. |